Kanoo installed and commissioned 4×10 DG sets with the following scope of work:


  • Supply of automatic synchronizing panel with load sharing and load dependent start/stop panel
  • The existing essential switchboards (4 No. s), receiving the generator incomers and feeding the essential loads consisting of 1 ATS panel were replaced with a new essential switchboard
  • All MCCB are fixed type with 35 KVA short circuit breaking capacity, incomers are 4pole MCCB
  • DG sets have been interconnected with a synchronized incomer
  • Refurbishment/replacement of 4 No. air-intake alternatives installed in the DG set room replacement of control cables
  • Synchronizing, testing, and commissioning of DG sets

OWNER / CLIENT:

DEPARTMENT OF HEALTH & MEDICAL SCIENCES – DOHMS, Dubai


CONTRACTOR:

THE KANOO GROUP

United Arab Emirates


PROJECT TITLE:

INSTALLATION OF 4 X 10 DG SETS (1000 KVA)

WITH ASSOCIATED WORKS